Our Grove GMK5250L, equipped with a complete 80-ton ballast configuration, was in operation at Portbury Dock in Bristol. Its task involved hoisting an Economizer weighing 78 tons from a MAFFI trailer onto transport provided by a third party, destined by road to West Bromwich after being shipped from China.