Sparrow Crane Hire was enlisted to assist DSW Demolition in a Contract lift project for the removal of the timber footbridge in the centre of Wadebridge, Nr. Bodmin, Cornwall. The lift involved road closures, and working through the night in order to ensure that it was carried out safely without as little disruption as possible to the community.