Exchanging a boiler for Wheeler & Son at a grade 2 listed site in Pimlico
Another happy client as we assisted Wheeler & Son to winch a new boiler that they had transported from Bosche in Austria. A job that had been in the planning for 3 years, after keeping it in storage they delivered it to a grade 2 listed site in Pimlico, London. Sparrow Crane Hire under a Contract Lift, making use of the vario base option with the outriggers, winched out the old boiler from the boiler room into a courtyard and then winched in the new. Wheeler & Son also replaced the burner and walkway.
According to Wheeler & Son - "The lads we had on site worked perfectly as planned and the job was smoothly executed. Well done to all of them, great team work."