At the weekend the crane featured below was our 200te capacity Liebherr LTM1200 5.1 on 46te counterweight. We were lifting 3 x 15m x 4.2m coldstores over the fence as the transport couldn’t access the site loaded.
We reloaded on to the vehicles and put them in their final position.
Once again the vario-base facility proved invaluable allowing the outriggers on the pavement side to be reduced to 90% to bring the outrigger pan central to the mat, whilst keeping the road space open to allow the trucks to pass the crane